Carton and Pallet Strapping Machines

Choose a strapping machine around what must stay together. Start with a table station for cartons handled one at a time, an inline arch for conveyor-fed cases, or a pallet station when the strap must reach through the base.

Comwin checks the strap path, the tension the pack can take and how the completed load reaches the next station.

    Strapped cartons next to a low strapped load on a wooden pallet
    Carton strapping and bands that reach through a pallet base. Packaging illustration.

    Choose how the strap reaches the load

    Start with the load, the position of each strap and how the pack moves to the next station.

    Your loadStarting setupWhat to test
    Individual cartons handled at a benchOperator-fed carton strappingEdge shape, joint and hand cycle.
    Cartons or groups arriving on a conveyorAutomatic arch strapping on a conveyorCase spacing, position and rate with all bands.
    Pallet load requiring bands through its basePallet strapping with a defined guide pathGuide clearance, band stability and handling access.

    Operator-fed carton strapping

    Individual cartons handled at a bench

    1. Place the carton
    2. Feed strap around the pack
    3. Tension, join and cut
    4. Check joint and corners

    On a semi-automatic table, the operator places the carton and feeds the band around it. The machine tensions, joins and cuts it. Use this arrangement when cartons are handled individually and positioning by hand fits the shift.

    Use the softest board and the heaviest pack in a trial. Set tension from the grip you need and check whether any carton edge begins to deform.

    The operator passes the loose end around the carton and returns it to the slot in the table.Loose strapInsert endOperator loops the band by hand
    The operator passes the loose end around the carton and returns it to the slot in the table.
    Straps across the taped center seams of two cartons
    Check the strap position, taped seam and square corners on a filled box. Packaging illustration.

    Automatic arch strapping on a conveyor

    Cartons or groups arriving on a conveyor

    1. Space the load
    2. Position the case in the arch
    3. Apply the required bands
    4. Send the load onward

    Match the opening to the largest pack in its travel orientation. Multiple bands may require indexing or turning. Compare sustained output with the actual band count.

    Check a skewed case and a closely spaced pair. Define where the infeed meters packs and which equipment stops after a failed cycle.

    The blue arch stays fixed. The orange path guides the band around the indexed carton.Fixed archBand pathCarton stops at the band position
    The blue arch stays fixed. The orange path guides the band around the indexed carton.

    Pallet strapping with a defined guide path

    Pallet load requiring bands through its base

    1. Position the load
    2. Line up the strap guide
    3. Tension and join
    4. Inspect after handling

    Mark the band direction and base openings in plan view. Select a guide that fits the actual pallet and conveyor. If load height can settle after strapping, test compression and edge protection with the actual pack.

    Check where deck boards or rollers cross the guide path. Run the actual base formats and lift the completed load with the planned handling equipment.

    Pallet viewed from strap-guide entryMark the proposed guide opening
    Photograph the base at guide-entry height. Include a second view along the strap path so we can check for blocks or boards behind the opening.
    Catalog pallet-strapping frame and base-level guide assembly
    Comwin pallet-strapping platform. Confirm the guide path using the actual pallet base.

    Hold the load without crushing the package

    Evaluate surface and layer restraint separately. A pallet stretch wrapper applies film to the load faces. Use a case sealer where the carton needs flap closure before strapping.

    Match material to the head
    PP is common for carton work. PET can suit heavier unit loads. Steel band calls for suitable tools and joining hardware. Confirm grade, dimensions and joining method before choosing a reel.
    Check edge pressure and the joint
    Inspect the strap contact, edge protectors and joint after the load has moved. A firm joint alone does not show that the pack can take the tension.
    Confirm rework and restart
    Challenge a failed strap feed. Assign where the pack is held and how you verify the next complete band pattern.

    Compare operator work and line handoffs

    Compare the same strap count and positions at the agreed output.

    StationOperator workInterface to agreeTrial
    Operator-fed carton strappingFeed and remove the pack by hand.Leave room for staging and rotation.Time a run with a change to the lightest board.
    Automatic arch strapping on a conveyorReplenish coils and respond to faults.Confirm conveyor level, case pitch and stop controls.Run all positions at production speed and check restarts.
    Pallet strapping with a defined guide pathInspect the joint and replenish the reel.Confirm pallet guide, base and turn sequence.Check loaded lifting and clearance on each base type.

    Compare proposals at the same scope

    Send the same load samples and rate to every supplier.

    CompareWhat to agree with ComwinWhat to verify in the offer
    Supply scopeMark the guides, station, conveying and any turner or edge protection.Identify the customer-supplied equipment on the layout.
    OutputSet accepted packs per hour at a given number of bands.Use the same load mix in the trial and log stops and restarts.
    Change formatsRecord strap settings and guide changes.Check changeover requirements on the formats that are hardest to run.
    SupportAgree operator training and access to routine wear parts.Set responsibility for faults between stations.
    DeliveryProvide a site layout, interfaces and samples for acceptance.Confirm who supplies materials, utilities and site connections.

    Application questions

    Does a band close carton flaps?

    Specify flap closure and the band separately. A band can reinforce a closed box. Agree where it should cross the taped carton.

    Can we use the same bands on cartons and pallets?

    Check material, width, thickness and joint against the head. Use actual loads to find separate strap tension settings.

    Send the load and mark the bands

    If set, include your target rate. A marked photo or a short line video can start the discussion.

    Operator-fed carton strapping

    Send first
    Send the smallest and largest filled cartons or drawings, the weakest board and the bands per box.
    What Comwin checks
    Support and reach at the table, strap width and the tension that preserves the edges.
    Inquiry subject to copy
    Operator-fed carton strapping

    Automatic arch strapping on a conveyor

    Send first
    Give the maximum loaded width and height as the carton enters the arch, the shortest carton length along the conveyor, and bands per carton. Mark band positions on a photo. Include line speed and a short video showing the smallest gap.
    What Comwin checks
    Arch clearance, index positions and signals between the conveyor and the strapping station.
    Inquiry subject to copy
    Automatic arch strapping on a conveyor

    Pallet strapping with a defined guide path

    Send first
    Send the load shape, gross weight, under-deck drawing, band count and direction. Show the pallet on the conveyor or floor. Include a photo at guide-entry height and a second view along the proposed path.
    What Comwin checks
    The route for each band and whether turning, a press or edge protection belongs in scope.
    Inquiry subject to copy
    Pallet strapping with a defined guide path